Already Have a Structure?

A garage, a basement, room above the garage, a shop or barn — what you already own can become an ADU. Here's what each one usually involves, what it tends to cost, and how to tell if yours is a good candidate.

Garage conversion

Turn an attached or detached garage into a legal, rentable ADU.

The walls, roof and slab are already there, so the work is mostly inside: closing in the garage door, insulating, and bringing in plumbing, power and heat. The guides don’t price attached and detached garages separately; HomeAdvisor notes an attached garage is usually the cheaper of the two to convert.

Typical scope

  • ✓Slab check and any repairs
  • ✓Garage door removed; new wall, window and entry
  • ✓Insulation to code
  • ✓Egress window in the bedroom
  • ✓Bathroom and kitchen plumbing
  • ✓Electrical and heating / cooling
  • ✓Fire separation where the garage meets the house
  • ✓Permits and impact fees
National cost guides
about $29,000–$67,000
This Old House 2026 price guide, $31,500–$73,200, adjusted ~8% lower for Twin Falls construction costs
Twin Falls ADU projects
$80,000–$150,000
Our published range for a legal, rentable ADU conversion

Why the gap? A legal, rentable ADU conversion typically adds fire separation, egress windows, insulation to code, separate or upgraded utilities, permits and impact fees, and design. The national guide figures often describe simpler conversions.

Timeline: 2–4 months of construction once permits are approved

Basement or interior space (junior ADU)

Convert a basement, bonus room or part of the house into a small unit of its own.

No new structure — the work is making an existing space livable and separate: a way in and out, light, dry floors and walls, and a kitchen and bathroom.

Typical scope

  • ✓Egress window or door for sleeping rooms
  • ✓Ceiling height check
  • ✓Moisture control for floors and walls
  • ✓Separate entrance
  • ✓Kitchen and bathroom plumbing
  • ✓Electrical, heating / cooling and ventilation
  • ✓Fire and sound separation from the main house
National cost guide
about $37,000–$115,000
HomeAdvisor 2026, $40,000–$125,000 national, adjusted ~8% lower for Twin Falls

Timeline: Confirmed at your assessment

Above the garage

A new garage with an apartment on top — or living space added over a garage you have.

This is new construction: the garage has to carry a second floor, and the unit needs its own stairs, plumbing and power run up to it. A structural engineer is part of the job.

Typical scope

  • ✓Structural engineering for the floor above
  • ✓Exterior or interior stairs
  • ✓Plumbing and electrical run to the upper floor
  • ✓Insulation, heating / cooling
  • ✓Roof and exterior to match the house
  • ✓Permits and impact fees
National cost guide
$125–$200 per sq ft
Fixr 2025, national average

Timeline: Confirmed at your assessment

Attached addition

Build a new unit onto the side or back of your home.

A new foundation, walls and roof tied into your house, with its own entrance, kitchen and bathroom. It has to meet the setbacks for the main house and match its roof, siding and windows.

Typical scope

  • ✓Foundation and framing
  • ✓Tie-in to the existing roof and walls
  • ✓Separate entrance
  • ✓Kitchen and bathroom plumbing
  • ✓Electrical, heating / cooling
  • ✓Fire separation from the main house
  • ✓Permits and impact fees
National cost guide
$80–$210 per sq ft
HomeAdvisor 2026, national average
Twin Falls ADU attached projects
$120,000–$250,000
Typical total, varies by size and complexity

Timeline: 3–5 months of construction once permits are approved

Shop, barn or outbuilding

Convert a detached shop, barn or other outbuilding into a home.

These vary more than anything else on this page — some have a slab and solid framing, others need nearly everything. Foundation, insulation, utilities and code upgrades all depend on what’s there.

Typical scope

  • ✓Foundation and structure check
  • ✓Insulation and new interior walls
  • ✓Water, sewer and power brought to the building
  • ✓Windows, egress and entry
  • ✓Kitchen and bathroom
  • ✓Permits and impact fees
Priced at your assessment
Too variable — and too little reliable cost data — to publish a range.

Timeline: Confirmed at your assessment

Do You Have…?

A quick gut-check before you call. If you're not sure about any of these, that's exactly what the assessment answers.

  • ☐ Ceiling height
    Is there about 8 feet of clear height inside? We recommend 8 feet minimum — low ceilings can rule a space out.
  • ☐ A way out (egress)
    Can a bedroom get a window or door big enough to climb out of in an emergency?
  • ☐ A dry slab
    Is the floor dry, with no standing water, big cracks or musty smell?
  • ☐ Utilities nearby
    How far is the space from your water, sewer and electrical panel — and does the panel have room?
Check it at your $499 assessment →

Common Questions

How we got these numbers

  • This Old House 2026 — garage conversion price guide (national figures)
  • HomeAdvisor 2026 — basement / interior conversion cost guide (national figures)
  • Fixr 2025 — garage with living space above cost guide (national figures)
  • HomeAdvisor 2026 — home addition cost guide (national figures)
  • Twin Falls adjustment: RSMeans 2021 City Cost Index (Twin Falls total factor 91.7; national average = 100). National totals are multiplied by 0.917 (about 8% lower) and rounded to the nearest $1,000. Per-square-foot figures are shown as published.
  • Twin Falls ADU ranges come from our own published project pricing.
  • Shop, barn and outbuilding conversions: the only published guide we found is from 2022 — too old to rely on, so we don't quote one.

Every price on this page is an estimate. Your real number is confirmed at your $499 assessment and set in a signed build agreement.

Find Out What Your Structure Can Become

We look at your garage, basement or outbuilding in person and give you a written report within 5 business days — what's possible, what it costs, and the permit path. Or start with a free 10-15 minute Readiness Call.