Know Exactly What You Can Build — Before You Spend a Dime on Design

Our ADU Feasibility Check answers every question: Can I build? How big? How much? How long? What's my best financing option? All in one comprehensive report — $499, applied to your construction contract by the contractor.

Why Start with a Feasibility Check?

Most ADU projects stall because homeowners invest in design before understanding their constraints. They pay an architect $3,000-$5,000 only to discover their lot has a utility easement, their setbacks are tighter than expected, or the project costs more than they budgeted.

Our Feasibility Check eliminates that risk. For $499, you get a complete picture of what's possible on your specific property — and if you go on to build, the contractor applies the fee toward your construction contract.

What Your Feasibility Report Includes:

  • ✓Site measurements and photos — exact buildable area on your lot
  • ✓Zoning and setback verification — your district (R-2, TN-1, TN-2, TN-3, RR), setbacks, and the 45% size calculation confirmed with Twin Falls P&Z
  • ✓Utility capacity assessment — per Title 10-6-10-B, your ADU must share water, sewer, and sanitation with the primary dwelling (no separate meters), so we verify your home's capacity
  • ✓Placement recommendations — best location for your ADU
  • ✓Budget range — a low-to-high cost estimate for your ADU, with what it assumes
  • ✓Realistic timeline — from design through Certificate of Occupancy
  • ✓Permit path — what's required for your specific jurisdiction
  • ✓Financing checklist — HELOC, construction loan, and other options
$499
Investment
Applied by the contractor if you build
5 Days
Report delivery
Business days after the visit
100%
Clarity
Before you commit

Garage Conversion or New Build?

Not sure which approach is right? The Feasibility Check evaluates both options. If you have an existing garage, we assess whether conversion makes sense structurally and financially — or whether a new detached build is the better investment. You get the comparison in your report.

How the Feasibility Check Works

A straightforward 4-step process to get the answers you need

1

Book Your Assessment

Book your $499 assessment online, then schedule your site visit. Prefer to talk first? A free 10-15 minute Readiness Call covers your property, goals, and timeline.

2

On-Site Visit + Assessment

A licensed contractor visits your property to take measurements, assess utility access points, evaluate soil and drainage conditions, and document everything with photos.

3

Research + Analysis

We verify zoning, setbacks, and lot coverage with Twin Falls Planning & Zoning. We research utility capacity and identify any potential obstacles.

4

Your Feasibility Report

You receive a comprehensive report with placement recommendations, budget range, timeline, permit path, and a personalized financing checklist.

Questions the Feasibility Check Answers

?Can I legally build an ADU on my lot?
?How big can my ADU be?
?Where on my property should it go?
?Can my utilities handle an additional unit?
?How much will it cost (realistically)?
?How long will it take from start to finish?
?What permits do I need?
?How should I finance it?
?Should I convert my garage or build new?
?What will the ROI be?

Get Your Feasibility Check

Book your $499 assessment online — applied to your construction contract by the contractor — and you'll have your complete report within 5 business days of the visit. Want to talk first? Start with a free 10-15 minute Readiness Call.