How Your ADU Gets Built — Foundation to Keys
We plan your ADU with you and assess feasibility first. Then we introduce you to a licensed contractor we work with, who manages every phase, every trade, and every inspection of the construction.
What the Contractor Builds
We do not build. We plan your ADU with you and assess whether it is feasible on your lot, then introduce you to a licensed contractor we work with. The contractor constructs detached ADUs, garage conversions, and installs pre-fabricated units across Twin Falls and the Magic Valley, to 2018 IRC standards. Your construction agreement is with the contractor.
Detached New Build
Ground-up construction on your property. Custom design, full utility connections, and complete site work.
- 500-1,200 sq ft
- $150,000-$350,000+
- 4-8 month build
Garage Conversion
Transform an existing garage into a fully permitted living space. Foundation work, insulation, new windows, and utilities.
- 400-600 sq ft typical
- $80,000-$150,000
- 2-4 month build
Pre-Fab Installation
Factory-built modules delivered and installed on your prepared site. Foundation, utilities, and finishing on-site.
- 400-1,000 sq ft
- $150,000-$280,000
- 8-14 weeks on site
How Projects Stay on Track
Regular Progress Updates
The contractor keeps you updated at each major milestone, so you know where your project stands.
Single Point of Contact
The contractor manages the project and coordinates all trades. You are not chasing down electricians, plumbers, or inspectors.
Code-Compliant Construction
The contractor builds each phase to 2018 IRC standards, and the city inspects it before the next phase starts.
Fewer Surprises
Our Feasibility Check identifies issues before construction starts, so the contractor can price a clear scope before breaking ground. Final pricing is set by the contractor.
Construction Comes After Planning
Nobody jumps straight to building. The contractor starts construction after your Feasibility Check and Design are complete and you have signed a construction agreement with the contractor. This means the decisions have been made, the permits are in hand, and the contractor has set the price before the first shovel hits the ground.
The Construction Process
How It Works
Site Preparation + Foundation
Excavation, grading, utility trenching, and foundation work. Concrete footings and slab or crawlspace per your design and Idaho soil conditions.
Framing + Exterior
Wall framing, roof structure, windows, doors, and exterior sheathing. Engineered for Twin Falls snow loads and wind conditions.
Rough-In: Plumbing, Electrical, HVAC
All mechanical systems installed by licensed professionals. Separate inspections for each trade before walls are closed.
Insulation + Drywall
Insulation installed to meet climate zone 5B/6B R-value requirements. Drywall hung, taped, textured, and ready for finishes.
Finishes + Fixtures
Flooring, cabinetry, countertops, tile, paint, fixtures, and appliances installed. This is where your ADU comes to life.
Final Inspection + Handoff
Final building inspection, Certificate of Occupancy issued, and the contractor hands you the keys to your finished ADU.
Project Gallery

Foundation & Framing

Interior Finishes

Completed ADU
Ready to Start Planning?
Every project starts with a free Readiness Call. We'll discuss your property, goals, and timeline — then map out the path to your finished ADU.