How Your ADU Gets Built — Foundation to Keys

We plan your ADU with you and assess feasibility first. Then we introduce you to a licensed contractor we work with, who manages every phase, every trade, and every inspection of the construction.

What the Contractor Builds

We do not build. We plan your ADU with you and assess whether it is feasible on your lot, then introduce you to a licensed contractor we work with. The contractor constructs detached ADUs, garage conversions, and installs pre-fabricated units across Twin Falls and the Magic Valley, to 2018 IRC standards. Your construction agreement is with the contractor.

Detached New Build

Ground-up construction on your property. Custom design, full utility connections, and complete site work.

  • 500-1,200 sq ft
  • $150,000-$350,000+
  • 4-8 month build

Garage Conversion

Transform an existing garage into a fully permitted living space. Foundation work, insulation, new windows, and utilities.

  • 400-600 sq ft typical
  • $80,000-$150,000
  • 2-4 month build

Pre-Fab Installation

Factory-built modules delivered and installed on your prepared site. Foundation, utilities, and finishing on-site.

  • 400-1,000 sq ft
  • $150,000-$280,000
  • 8-14 weeks on site

How Projects Stay on Track

Regular Progress Updates

The contractor keeps you updated at each major milestone, so you know where your project stands.

Single Point of Contact

The contractor manages the project and coordinates all trades. You are not chasing down electricians, plumbers, or inspectors.

Code-Compliant Construction

The contractor builds each phase to 2018 IRC standards, and the city inspects it before the next phase starts.

Fewer Surprises

Our Feasibility Check identifies issues before construction starts, so the contractor can price a clear scope before breaking ground. Final pricing is set by the contractor.

Construction Comes After Planning

Nobody jumps straight to building. The contractor starts construction after your Feasibility Check and Design are complete and you have signed a construction agreement with the contractor. This means the decisions have been made, the permits are in hand, and the contractor has set the price before the first shovel hits the ground.

The Construction Process

How It Works

1

Site Preparation + Foundation

Excavation, grading, utility trenching, and foundation work. Concrete footings and slab or crawlspace per your design and Idaho soil conditions.

2

Framing + Exterior

Wall framing, roof structure, windows, doors, and exterior sheathing. Engineered for Twin Falls snow loads and wind conditions.

3

Rough-In: Plumbing, Electrical, HVAC

All mechanical systems installed by licensed professionals. Separate inspections for each trade before walls are closed.

4

Insulation + Drywall

Insulation installed to meet climate zone 5B/6B R-value requirements. Drywall hung, taped, textured, and ready for finishes.

5

Finishes + Fixtures

Flooring, cabinetry, countertops, tile, paint, fixtures, and appliances installed. This is where your ADU comes to life.

6

Final Inspection + Handoff

Final building inspection, Certificate of Occupancy issued, and the contractor hands you the keys to your finished ADU.

Project Gallery

Detached ADU exterior with siding and sliding glass door

Foundation & Framing

ADU bathroom with marble tile shower and modern finishes

Interior Finishes

Completed ADU exterior with front porch and modern railings

Completed ADU

Ready to Start Planning?

Every project starts with a free Readiness Call. We'll discuss your property, goals, and timeline — then map out the path to your finished ADU.