A Clear Process From First Question to Finished ADU
Most ADU projects fail because of confusion, not construction. Our 3-level guided process gives you clarity, confidence, and a clear path to a licensed contractor.
We Sell a Process, Not a Project
Building an ADU involves dozens of decisions — zoning, design, permits, financing, construction, utilities, inspections. Most homeowners have never done this before and don't know where to start.
Our 3-level process is designed so you get exactly the right amount of information and commitment at each stage. No pressure to commit before you're ready. No surprises down the road.
Our 3-Level Guided Process
We guide you from an idea to a clear plan - then introduce you to a licensed contractor we work with, who builds it.
ADU Readiness Call
Free 10-15 minute consultation
10-15 minutes
- Quick property eligibility assessment
- Garage conversion vs new build guidance
- Rough budget and financing reality check
- Timeline and urgency discussion
- Determine if an ADU makes sense for you
ADU Feasibility + Budget Range
Professional on-site assessment
Site visit + comprehensive report
- Detailed site measurements and notes
- Utility approach and capacity assessment
- Layout and placement recommendations
- Permit path and egress verification
- Budget range for your ADU
- Realistic timeline estimate
- Financing options checklist
Build with a licensed contractor
We introduce you; the contractor builds
Your agreement is with the contractor
- An introduction to the licensed contractor we work with
- The contractor handles design drawings and permits
- The contractor performs the construction and utility connections
- Your construction agreement is with the contractor
- The contractor applies your $499 toward that agreement
- Final pricing is set by the contractor
What You Get at Each Level
Level 1: ADU Readiness Call (Free)
This is a quick 10-15 minute phone or video call where we learn about your property and your goals. No sales pitch — just honest answers.
We'll discuss:
- ✓Your property location and lot basics
- ✓What you want to use the ADU for
- ✓Garage conversion vs new build options
- ✓Rough budget expectations
You'll know:
- ✓Whether an ADU is likely viable for your lot
- ✓A rough sense of cost and timeline
- ✓Whether the next step makes sense
Duration: 10-15 minutes | Cost: Free | Next step: Book a Feasibility Check if it makes sense
Level 2: ADU Feasibility + Budget Range
Most PopularThis is where the real value lives. A licensed contractor visits your property, takes measurements and assesses everything that matters, and you get a comprehensive report that answers every question you have.
Your Feasibility Report includes:
- ✓Detailed site measurements and photos
- ✓Utility access and capacity assessment
- ✓Zoning and setback verification
- ✓ADU placement and layout recommendations
- ✓Budget range for your ADU
- ✓Realistic construction timeline
- ✓Permit requirements for your jurisdiction
- ✓Financing options checklist
Investment: $499 (applied to your construction contract by the contractor if you build; the report is yours to keep) | Delivery: within 5 business days of the visit
Level 3: Build with a Licensed Contractor
Once you have your Feasibility Report and decide to move forward, we introduce you to the licensed contractor we work with. The contractor takes responsibility for your ADU project — from design drawings through construction to final inspection — under a construction agreement between you and the contractor.
The contractor's design phase:
- ✓Custom architectural plans
- ✓Material and finish selections
- ✓Engineering as needed
The contractor's build phase:
- ✓All permits filed and managed
- ✓Construction and utility connections
- ✓Project management
- ✓Final inspection and CO
The Big Picture: 4 Phases to Your Finished ADU
From first conversation to the keys to your finished ADU
Free Readiness Call
A 10-15 minute conversation to assess your property basics, goals, and determine if an ADU is right for your situation.
Feasibility Check + Report
Professional site visit with measurements, utility assessment, and a detailed report including budget range, timeline, and financing options.
Design + Permitting
We introduce you to the licensed contractor we work with. The contractor produces the design drawings for your property and prepares and submits all permit applications to Twin Falls or your local jurisdiction.
Construction + Completion
The contractor builds your ADU from foundation to final inspection, under a construction agreement between you and the contractor, and hands you the keys to your finished ADU.
Why Does This Process Work?
No Wasted Money
You know exactly what you can build, what it costs, and how to finance it before committing to construction.
No Surprises
Every question gets answered at the Feasibility stage — not after you've already broken ground.
No Pressure
Each level is a natural next step. You decide when to proceed — and if you build, the contractor applies the Feasibility fee toward your construction contract.
Take the First Step — It's Free
Book a 10-15 minute Readiness Call. We'll assess your property, answer your questions, and tell you honestly whether an ADU makes sense for your situation.