ADU Planning inBurley, Idaho

Twin Falls ADU Guys helps homeowners plan ADUs in Burley and across Cassia County. Same guided process — feasibility, design help, and an introduction to a licensed contractor for permitting and construction.

Cassia County~35 miles east of Twin FallsPopulation ~11,700

ADU Services in Burley

Burley is the Cassia County seat and one of the larger communities we serve in the eastern Magic Valley. Homeowners in Burley have the same strong reasons to add an ADU — rental income, multi-generational housing, and significant property value appreciation. We check your plan against local Cassia County zoning requirements, and the licensed contractor we work with handles the Burley permitting process.

Permitting in Burley

Burley (population ~11,700) is over 10,000, so Idaho SB 1354 requires it to allow at least one ADU per single-family lot by-right. For unincorporated county / Burley Area of City Impact parcels, Cassia County code allows a 300-1,000 sq ft ADU on a 1-acre-minimum lot with a recorded deed restriction. We confirm which jurisdiction your parcel falls under during the Feasibility Check.

Local Permit Office: City of Burley Planning & Zoning (in-city) / Cassia County Zoning & Building (county + impact area)Phone: 208-878-2224 (City Planner) / 208-878-7302 (Cassia County)

ADU Rules in Burley

SB 1354 applies

Burley (2020 Census 11,704) is over 10,000, so Idaho SB 1354 (effective July 1, 2026) requires it to allow at least one ADU per single-family lot by-right and amend its code by February 1, 2027.

Zoning authority
In-city: City of Burley Planning & Zoning, 1401 Overland Ave (208-878-2224, City Planner Spencer McArthur). Unincorporated county / Area of City Impact: Cassia County Zoning & Building, 1459 Overland Ave Rm 210 (208-878-7302, bldgdept@cassia.gov).
ADU size limit
Unincorporated Cassia County / Burley Area of City Impact: 300-1,000 sq ft (excluding garage), 1-acre minimum lot, one ADU per lot, attached or detached (Cassia County Code 9-9-4(W)). An in-city Burley cap was not separately confirmed — verify with the City Planner. SB 1354 also bars bound cities from capping below 1,000 sq ft / 75% of primary.
Setbacks
Unincorporated county: 54 ft from road center, 15 ft interior (houses), 10 ft (accessory buildings). In-city R-1: an accessory building with sleeping quarters keeps the district side yard and sits at least 25 ft from the rear line. Confirm in-city values with the City Planner.
Permits & fees
No ADU-specific permit fee is published for either jurisdiction; building permits are valuation-based. Get a quote from the office above.
Owner-occupancy
County: a recorded Declaration of Restriction (no separate sale, common ownership, <=1,000 sq ft) is required before permit issuance. SB 1354 prohibits bound cities from requiring owner-occupancy.
Typical 1BR ADU rent
$850–$1,000/month (estimate)
These are the rules we have verified from official sources as of June 2026. ADU codes change — we confirm every figure (and get exact fee quotes) for your specific parcel with City of Burley P&Z 208-878-2224 (in-city) or Cassia County 208-878-7302 (county) during your $499 Feasibility Check (applied to your construction contract by the contractor).

What an ADU Can Do for Burley Homeowners

$850–$1,000
Estimated monthly rent, 1BR (varies by city)
Rentable
A separate income-producing unit
6–12 mo
Typical project timeline

ADU Types We Help You Plan

  • ✓Detached new build ADU
  • ✓Garage conversion ADU
  • ✓Attached ADU addition
  • ✓Pre-fabricated ADU installation
  • ✓Basement conversion (where applicable)

What the Process Includes

  • ✓Feasibility assessment + site visit
  • ✓Written report and ADU design help
  • ✓Introduction to a licensed contractor we work with
  • ✓Contractor: design drawings, permits, and all trades
  • ✓Contractor: final inspection + Certificate of Occupancy

Idaho SB 1354 Protects Your Right to Build in Burley

Because Burley has a population over 10,000, Idaho Senate Bill 1354 (effective July 1, 2026) requires it to allow at least one ADU per single-family lot as a by-right use, and the city must align its code by February 1, 2027. Separately, Idaho HB 166 protects an internal ADU on an owner-occupied homestead from HOA bans. Learn more about Idaho ADU law →

How Your ADU Gets Built in Burley

The same proven 4-step process we use across the Magic Valley

1

Free Readiness Call

10-15 minutes. We learn about your property and goals, and confirm whether a Feasibility Check makes sense.

2

Feasibility Check ($499)

On-site visit, measurements, zoning verification with your local planning department, utility assessment, and a complete report with budget range.

3

Design + Permits

We introduce you to the licensed contractor we work with, who designs your ADU to code and handles every permit application with your city and county building department.

4

Construction

The contractor handles all trades — framing, plumbing, electrical, HVAC, and finishes. Your construction agreement is with the contractor.

Also Serving Near Burley

We serve all of Cassia County and surrounding communities. If you are near Burley, we can help — contact us to confirm availability for your specific location.

Common Questions

Can I build an ADU in Jerome or Burley, Idaho?

Idaho Senate Bill 1354 (effective July 1, 2026) requires cities over 10,000 people to allow at least one ADU per single-family lot as a by-right use. In the Magic Valley that means Twin Falls, Jerome and Burley, which must update their codes by February 1, 2027. Smaller cities are not bound by it, so there it depends on local zoning. We check your specific lot in the Feasibility Check.

Who builds ADUs in Burley, Idaho?

Twin Falls ADU Guys plans your Burley ADU: we check feasibility, calculate your size limit, and help you design it. An independent, licensed Idaho contractor then builds it, and your construction agreement is with that contractor. Start with a $499 Feasibility Check or a free 10-15 minute Readiness Call to find out what your Burley lot can support.

Ready to Build an ADU in Burley?

Book your $499 assessment — applied to your construction contract by the contractor. A licensed contractor visits your property, and your written report covers the local permit process and tells you exactly what's possible. Want to talk first? Start with a free 10-15 minute Readiness Call.